... Search Here ...

Store 90%
Sales
0
Refunds
0
Seller Offline
0 0
6.8 $
Visa MasterCard Mir WebMoney Steam Skin Alipay Unionpay Turkish Bank Card PAYMER check (WM Card) Gift Card Bitcoin Litecoin Digiseller USDT (Tether TRC20) Ethereum PIX
Loyalty discount! If the amount of your purchases from the seller al_ac is more than:
Practical work 1. Determination of the wall thickness of the pipeline

Purpose of work: Determination of the wall thickness of the pipe section of the main pipeline with an outer diameter of Dn.
Initial data:
category of land - B,
internal pressure - p = 5.0 MPa,
steel grade - 13G1S-U,
pipe wall temperature during operation - te = 4ºС,
fixation temperature of the design scheme of the pipeline - tf = -33ºС,
reliability coefficient for pipe material - k1 = 1.4
reliability coefficient for the load - the internal working pressure in the pipeline n = 1,1,
working pressure p = 5.0 MPa
the outer diameter of the pipe Dn = 530 mm
standard resistance to tensile (compression) of the pipe metal, is taken equal to the ultimate strength вр = 510 MPa
coefficient of pipeline operating conditions m = 0.75
reliability coefficient for the purpose of the pipeline kн = 1
reliability coefficient for load - internal working pressure in the pipeline n = 1,1
Physical characteristics of steel α = 1.2 · 10-5, E = 2.06 · 105, μ = 0.3
Tasks for laboratory work.
Practical work №2
Determining the step of the placement of goods during installation
waterlogged pipelines

Purpose of work: Calculate the spacing of reinforced concrete or cast-iron cargoes when laying a pipeline through a swamp. The initial data for the calculation: the outer diameter of the pipe - Dн, wall thickness, type of cargo, its mass and dimensions.
Tasks for laboratory work.
Two practical works